9-Story Hotel Construction – Dunwoody, GA

Description A new 85,800 sq ft hotel construction used FORTA-FERRO macro synthetic fiber to reinforce the concrete in the slab-on-ground and all 9 elevated floor decks in this mid-rise building. A fiber dosage of 3.0 lb/cu yd in the bottom slab and a dosage of 4.0 lb/cu yd in the metal decks replace the originally […]

Read More

35W@94: DOWNTOWN TO CROSSTOWN – MINNEAPOLIS, MN

MnDOT specified fibers be used in 11 bridges being done on I-35W and I-94 from downtown to crosstown in Minneapolis, MN. This is a lengthy project which includes installing new non-fiber concrete on a 50-year old freeway, new ramp access from I-35W south to Lake St. and from I-35W north to 28th St.,and building MnPASS lanes near the downtown bus station at Lake St. for better transit service.

Read More