Sorting Center – Plymouth, MI

Plymouth, MI - August - October 2021

Project Description

FORTA-FERRO macro synthetic fibers were used in this newly constructed sorting center. Owners saw substantial cost savings and increased job-site safety due to the elimination of wire mesh or steel rebar.

Technical Specifications

  • Fiber Reinforcement: FORTA-FERRO® 2-¼”
  • Dosage: 4.0 lb/cu yd
  • Delivery Method: Pumped
  • Finish Method: Steel-Troweled; Broomed

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =