Glenwood Beer Distribution

Project Description This project was for a new beer distribution warehouse in Rideway, PA, that included floor slabs, drive thru pavement, a freezer floor slab, and a storage area. The office floor slabs used 4 lbs. / cu. yd. of FORTA-FERRO®. The drive thru, freezer floor slab, and storage area all used 7.5 lbs. / cu. yd […]

Read More

Mars School District Storage Building

Project Description This project was for a building at the Mars High school in order to store landscaping equipment for their campus maintenance. Atlantic Engineering had used FORTA-FERRO® in previous projects and was very happy with the ease of placement and finishing ability and thought the Mars High School project would be a great application to use it once again. […]

Read More

Monarch Products

Project Description This project was to an additional project to the Monarch Products special products production floor. Monarch Products has been a long-term FORTA-FERRO® customer due to their use of fibers in their septic tanks. This was the first time the contractor for the project had used FORTA-FERRO® and was very pleased with the way they mixed and finished. Key […]

Read More

Betters Warehouse

Project Description Betters Warehouse was the first of many projects for the Shell Oil Corporation. This initial project was needed to create a lay down yard for the larger buildings yet to come. The slab was 7 inches thick on one layer of plastic sheeting. By choosing to use FORTA-FERRO®, the joints were able to be […]

Read More

Bon Tool Company

Project Description Ownership of the Bon Tool Company in western Pennsylvania investigated the use of fiber reinforcement as an alternative to conventional steel in their large warehouse/office space addition. Approved by both owner and project engineer, FORTA-FERRO® was used in over 55,000 square feet of 6″ thick warehouse slab-on-ground, and 15,000 square feet of 3″ […]

Read More

Georgia D.O.T. Bridge Deck

Project Description The bridge, originally built in the 1950’s, had been resurfaced in 1997, but had already deteriorated to the point of necessary repair. The Georgia D.O.T. looked to FORTA-FERRO® as an easy-to-use and cost-effective method to add a high level of crack control and long-term durability. After scarifying 3-1/2″ of deteriorated concrete, a cement […]

Read More

Atlanta Botanical Gardens Walkway

Project Description Halvorson and Partners Engineers of Atlanta specified FORTA-FERRO® in addition to conventional reinforcing steel for a unique suspended walkway project within the Atlanta Botanical Gardens.  Over 500 feet in length, the elevated sidewalk was 10 – 12 feet wide and placed at 5 inches thick on the special metal deck and suspension system. The engineer’s […]

Read More

Cosmopolitan Luxury Apartments

Project Description Cosmopolitan Luxury Apartments was looking for an alternative to using steel reinforcement in their design. From using FORTA-FERRO® in previous projects, Hoy Construction knew the results would be of very high quality. It was decided to use the FORTA-FERRO instead of using steel. Project specifiers were very pleased and excited by the end results. Due […]

Read More

Atlanta Bonded Warehouse

Project Description The Atlanta Bonded Warehouse group was founded in 1948 by a Peter Paul candy broker to provide protective warehousing to the confectionery industry. Since that time, ABW has grown to include over 2,000,000 square feet of public and contract food-grade temperature-controlled logistics and distribution services across the southeast United States. As a result, […]

Read More

Attaway Waste Services

Project Description The elimination of the normal steel was achieved for this project by using 7.5 lbs. / cu. yd. of the 2-1/4″ long FORTA-FERRO®, and also the elimination of the normal sawcut-joints over the 80 ft. x 75 ft. expanse. Fowler Flemister supplied 185 cubic yards of FORTA-FERRO® reinforced concrete for the new project, and was […]

Read More