Mars School District Storage Building

Mars, PA - June 2014

Project Description

This project was for a building at the Mars High school in order to store landscaping equipment for their campus maintenance. Atlantic Engineering had used FORTA-FERRO® in previous projects and was very happy with the ease of placement and finishing ability and thought the Mars High School project would be a great application to use it once again.

Key Points:

  • Superior Finish
  • Extreme Durability
  • Mixing

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =