SDSU Aztec Student Union Building

Project Description San Diego State University was in need of a reinforcement method for a slab-on-ground and two slab-on-metal-decks which included radiant heating/cooling systems for their Aztec Student Union building on campus. FORTA-FERRO® was chosen to reinforce each slab due to its ability to reduce cracking while creating an excellent finish. The fibers also allowed for the floors to have a […]

Read More

Prologis – Bethlehem

Project Description The warehouse facility in Prologis Park chose to use FORTA-FERRO® to replace traditional methods of steel reinforcement, saving the owner time and money. Placing steel reinforcement in such a large facility is costly and time consuming. The ready mix producer was extremely pleased with how easily FORTA-FERRO®  mixed within the concrete and how well it finished when applied. […]

Read More

LDS Church

Project Description LDS Church chose to use FORTA-FERRO® to reinforce their large meeting house floor slab as a “cost-controlling and premium performance floor system”. Previous floor design containing rebar had been less successful when investigated because owners wanted a better way to control shrinkage and temperature related cracking. Project specifiers decided that FORTA-FERRO® would be the ideal reinforcement method to address […]

Read More

Food Warehouse

Project Description A food warehouse in Belgium was in need of a reinforcement method for their floors. Originally, steel fiber was specified as the reinforcement method but was ultimately abandoned due to the temperature changes that the food storage environment requires on a daily basis. Specifiers chose FORTA-FERRO® as a viable solution to the temperature issue while also being easier […]

Read More

University of Akron Football Stadium

Project Description University of Akron and their 25,000-seat football stadium were in need of two levels of fiber reinforcement in order to control cracking. Project specifiers called for 4.5 lbs. / cu. yd of FORTA-FERRO® to reinforce 4,000 cu. yds. of concrete bleachers. This was the first project in the U.S. that utilized a special ‘high-fiber round-bar’ pump grate developed […]

Read More

Reserves at Southpoint

Project Description Reserves at Southpoint needed an easy to use and cost-effective reinforcement method for their condominium floors and their resident garage floors. The complex owners chose to use FORTA-FERRO® for their slab-on-ground applications due to its superior durability, ability to reduce cracking, and ability to easily mix, place and finish extremely well. FORTA-FERRO® was chosen as an alternative to traditional […]

Read More

Highwood Plastics

Project Description Highwood Plastics required additional space for their loading dock and area surrounding their warehouse. For this exterior concrete slab addition project, FORTA-FERRO® was chosen as the reinforcement method in an effort to reduce cracking. As a first time user of FORTA-FERRO®, the contractor was exceedingly pleased with the outcome of the project. FORTA-FERRO® showed superior mixing, placing and finishing […]

Read More

Prologis 3

Project Description The warehouse facility in Prologis Park chose to use FORTA-FERRO® to replace traditional methods of steel reinforcement, saving the owner time and money. Placing steel reinforcment in such a large facility is costly and time consuming. The ready mix producer was extremely pleased with how easily FORTA-FERRO® mixed within the concrete and how well it finished when applied. […]

Read More

Tampereen Rantatunneli

Project Description For this project in Finland, the goal was to properly reinforce concrete tunnels while also remaining conscious of the project budget and time frame. FORTA-FERRO® was chosen to reinforce the two 2,340 meter long road tunnels using a shotcrete application. In addition to FORTA-FERRO®’s superior mixing and durability, it also saved the owner time and money with […]

Read More

Antalya Expo 2016

Project Description The Antalya Expo 2016 in Antayla, Turkey attracted thousands of visitors to their fair grounds. They had a limited time frame for the project due to the opening of the Expo in the months ahead. The owner preferred FORTA-FERRO® to speed up the concrete construction portion of the project which aided in beating the […]

Read More