Pervious Concrete VI
Last weeks blog covered a recent pervious concrete seminar and demonstration hosted by contractor-client, The Bazella Group of Allentown, PA. This weeks blog will discuss some of the different surface finish methods used for the pervious concrete samples.
Plastic sheeting is immediately placed over the concrete and generally left in place for 7 days. The entire process from truck chute to roller-screed to finish, spray, and cover, is typically only about 15 minutes – a far cry from waiting for conventional slabs to gel, bleed, finish, etc.
For more information, please visit: www.forta-ferro.com