GM Battery Plant – Lake Orion, MI

Lake Orion, WA - March 2023

Project Description

This battery plant, the first of its kind in the Midwest, is also the largest construction project in the state of Michigan for 2023-2024. The reinforcement capabilities of FORTA-FERRO will offer long term durability and increased crack control as well as improved safety onsite.

Technical Specifications

  • Fiber Reinforcement: FORTA-FERRO® 2-¼”
  • Dosage: 5.0 lb/cu yd
  • Total Project Size: 104,000 yds
  • Delivery Method: Tailgated
  • Finishing Method: Troweled

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =