Project Description
A manufacturing company in Nuremberg, Germany, was in need of a superior reinforcement method for their large slab-on-ground application for a storage warehouse. Project owners decided to reinforce the application (20 cm thick) with 2.5 kg. / cu. m. of FORTA-FERRO®. The warehouse slab – with the help of FORTA-FERRO® synthetic fiber – will be able to withstand heavy equipment and storage loads.
Key Points
- Reduced Cracking
- Mixed and Placed Easily
- Cost Effective
- Superior Finish