Towne Club Windermere

Cumming, GA - October 2015

Project Description

Towne Club Windermere needed a superior reinforcement method for a multi-story retirement facility. For this 6” thick, 4,000 psi composite metal deck project, FORTA-FERRO® was used as a replacement for the 4 x 4 W2.1 x W2.1 wire mesh reinforcement. It was easily pumped, placed, and finished by Wheeler Services of Alpharetta, GA. Wheeler, an experienced fiber reinforcement contractor, prefers the ease of adding fibers to the mix vs. the potential tripping hazard of the wire mesh fabric on upper-deck projects. In total, over 2,500 cubic yards of FORTA-FERRO® reinforced concrete was used in this high-end and high-profile project.

Key Points:

  • Superior Finish
  • Excellent Mixing
  • Easily Pumped & Placed

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =