Project Description
Towne Club Windermere needed a superior reinforcement method for a multi-story retirement facility. For this 6” thick, 4,000 psi composite metal deck project, FORTA-FERRO® was used as a replacement for the 4 x 4 W2.1 x W2.1 wire mesh reinforcement. It was easily pumped, placed, and finished by Wheeler Services of Alpharetta, GA. Wheeler, an experienced fiber reinforcement contractor, prefers the ease of adding fibers to the mix vs. the potential tripping hazard of the wire mesh fabric on upper-deck projects. In total, over 2,500 cubic yards of FORTA-FERRO® reinforced concrete was used in this high-end and high-profile project.
Key Points:
- Superior Finish
- Excellent Mixing
- Easily Pumped & Placed
Download PDF