T3-1/T4-1 Distribution Center

Incheon, South Korea - March 2o17

Project Description

This 50,000 square meter T3-1/T4-1 distribution center consists of two separate centers. Each building has four floors above the ground level. The 4th floor of each structure, consisting of 10,000 square meters, each was reinforced with FORTA-FERRO® which replaced traditional 7 mm @ 200 x 200 steel fabric. Facility owners benefited from FORTA-FERRO®’s ability to speed up the construction process and reduce cracking compared to the traditional steel reinforcement.

Key Points:

  • Superior Finish
  • Extreme Durability
  • Mixing

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =