State Route 28 On/Off Ramps – Slate Lick , PA

Slate Lick, PA - August 2022

Description

Pennsylvania Department of Transportation (PennDOT) used FORTA-FERRO reinforcement fibers to reconstruct the on/off ramps on this heavy-volume road. The macro synthetic fibers increase impact resistance and decrease concrete permeability allowing this repair to remain Stronger Lasting™.

Technical Specifications

  • Fiber Reinforcement: FORTA-FERRO® 2-¼”
  • Total Project Size 800 yds
  • Delivery Method: Tailgated
  • Finishing Method: Heavy Broomed

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =