Project Description
Reich Construction was able to extend joint spacing and replace rebar in this 1000 cu yd project. FORTA-FERRO was specified at a dosage of 7.5 lb/cu yd in the church floor to reduce the number of joints needing to be cut. A dosage of 5.0 lb/cu yd in the exterior paving, allowed the elimination of tying and storing cumbersome rebar.
Utilizing FORTA-FERRO macro-synthetic fiber allows contractors to save time and money while adding needed reinforcement.
Key Points
- Save Time
- Save Money
- Increase Joint Spacing