Crown Hotel Pool

Overland, KS - February 2009

Project Description

Swim Things Inc., chose to add 5 lbs. / cu. yd. of the FORTA-FERRO® to control cracking, while increasing the bar spacing to 36″ O.C. The fiber was added and mixed on-site by the ready-mix producer and the fiber-reinforced concrete was shotcreted onto the structure as normal with no changes to conventional procedure. This 80 cubic yard hotel pool was finished in normal fashion, using 3 foot-long wooden hand floats for initial strike-off. Even with a relatively robust dosage of 5 lbs. / cu. yd., the fibers were not readily noticeable on the initial screeded surfaces, and did not negatively affect the final pool finish. Due to the successful ability to reduce cracking on this project, Swim Things has continued the 3-dimensional macro synthetic fiber practice in over 800 cubic yards of shotcrete pool construction to date.

Key Points:

  • Superior Finish
  • Extreme Durability
  • Mixing

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =