Project Description
Salem Metal Inc. constructed a new, single story metal fabrication shop with a total project size of 102,660 sq ft. The owner of this property chose FORTA-FERRO macro synthetic fibers to replace
the welded wire in this slab-on-ground project. This is one of several projects by an engineering firm, developer, and owner team, who have seen the benefits of fiber over steel and decided to incorporate this switch as a construction management best practice. FORTA-FERRO fibers provided convenience, savings, and speed over welded wire while providing better fortification.
Key Points:
- Provide Convenience
- Saved Time
- Cost Savings