Project Description
Using FORTA-FERRO® saved the developer one week in a month when pouring and placing steel. FORTA-FERRO® served as a replacement for 6 x 6-W1.4/W1.4 in SOG, 6 x 6 -W2.9/W2.9 in the elevated slabs, and 6 x 6 W4/W4 in the roof slab.
Key Points:
- Superior Finish
- Extreme Durability
- Mixing
Download PDF