Project Description
The Pequae School was in much need of a remodel that included new concrete flooring for their gymnasium and also multiple classrooms. The project required a smooth finishing surface for their floors that was both easy to work with and easy to finish.The 4” concrete slabs for each application were reinforced with FORTA-FERRO® in order to reduce cracking and increase overall durability. The contractor, who had never worked with FORTA-FERRO® before, was extremely pleased with the results.
Key Points:
- Reduced Cracking
- Extreme Durability
- Excellent Mixing & Finishing