Oklahoma Turnpike Authority (OTA) Toll Plaza – Colcord, OK

Colcord, OK - October 2019

Project Description

The Oklahoma Turnpike Authority (OTA) specified FORTA-FERRO macro synthetic fibers to repair distressed areas of their Toll Plaza in this slab-on-ground application. Imbedded electronic axle readers caused the existing concrete to ravel and sustain edge issues which has been a major problem in the past. FORTA-FERRO was utilized to curb these issues with OTA engineers stating, “this unique use of fiber reinforcement has completely eliminated these problems.”

Key Points

  • Prevent Joint Raveling
  • Increased Durability
  • Reduces Curling

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =