Millwright Building – Minneapolis, MN

Minneapolis, MN - 2016

Project Description

Millwright Building will soon be the new corporate headquarters of Ryan Companies’ North Region. In this project, two different dosages were being used as a case study for the long term performance of FORTA-FERRO. The project contractor stated, “We believe that these fibers help to increase the performance of the slabs by reducing the scope of shrinkage cracking”. Additionally, the owner and engineer saw a reduction in time needed to complete the project by eliminating the need to install mesh/accessories in their slabs. FORTA-FERRO’s consistent performance proved to the contractor that it was the best choice for their project.

Key Points:

  • Reduced Shrinkage Cracking
  • Save Time
  • Save Money

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =