Project Description
Millwright Building will soon be the new corporate headquarters of Ryan Companies’ North Region. In this project, two different dosages were being used as a case study for the long term performance of FORTA-FERRO. The project contractor stated, “We believe that these fibers help to increase the performance of the slabs by reducing the scope of shrinkage cracking”. Additionally, the owner and engineer saw a reduction in time needed to complete the project by eliminating the need to install mesh/accessories in their slabs. FORTA-FERRO’s consistent performance proved to the contractor that it was the best choice for their project.
Key Points:
- Reduced Shrinkage Cracking
- Save Time
- Save Money