Project Description
FORTA-FERRO® was used to replace specified steel for a multistory shopping plaza in Lehi, Utah. This 101,000 sq. ft. project featured four stories of composite metal deck applications using FORTA-FERRO®. The project’s superintendent was impressed with fibers ability to increase concrete pump ability using lightweight aggregate. In addition, the FORTA-FERRO® was preferred over competing reinforcement due to its superior crack control, uniform distribution, and superior finish.
Key Points
- Reduced Cracking
- Mixed and Pumped Easily
- Cost Effective
- Superior Finish