Description
A large 1,372 sq. m. warehouse slab-on-ground utilized FORTA-FERRO® as the reinforcement method due to its superior crack control. The concrete flooring was poured before the walls and structural support beams were added during the cure period, which worried the contractor when it came to premature cracking. Thanks to FORTA-FERRO®, the construction team saw no cracking and a quick building process.
Key Points
- Reduced Shrinkage Cracking
- Added Toughness
- Extremely Durable