Description
FORTA team members worked with Triad Design to design this 750,000 sq ft. warehouse floor based on owners ‘criteria. Triad Design normally use rebar or wire mesh. However, FORTA-FERRO provides a faster start and finish because of the scarcity of wire mesh. The owner could start on their schedule, not the wire mesh mill schedule. This project, for one of the largest developers in Greensboro, worked in conjunction with a high profile concrete finisher and ready-mix company.
Key Points
- Increased Durability
- Improved Worksite Safety
- Saved Time & Money