Forgotten Harvest – Oak Park, MI

Oak Park, MI - 2021

Description

Dedicated to relieving hunger in the Metro Detroit Area, Forgotten Harvest invested in this newly constructed multi-story building. FORTA-FERRO macro synthetic fibers replaced specified steel mesh at a dosage of 4.0 lb cu/yd in multiple applications. Due to supply chain issues, the cost of fiber reinforcement saved money compared to steel mesh and eliminated safety issues associated with storing and placing wire mesh.

Key Points

  • Increased Durability
  • Saved Time & Money
  • Replaced Steel Reinforcement

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =