Fillmore County Overlay – Lanesboro, MN

Lanesboro, MN - 2023

Project Description

The contractor was able to reduce time and material by eliminating the steel from this project. Their paving machine was able to install a beautiful, groomed finish as fast as the concrete could be delivered without stopping to install steel. Croell added the fibers at their mobile batch plant directly from large containers or gaylord’s saving them time and waste at the batch plant.

Technical Specifications

  • Fiber Reinforcement: FORTA-FERRO® 2-¼”
  • Application: Overlay
  • Delivery Method: Tailgated
  • Finishing Method: Heavy Broomed

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =