Fiat/Chrysler Manufacturing Floors

Goiana, Pernambuco, Brazil - April 2013 - July 2015

Project Description

The Fiat/Chrysler facility encompasses 5.4 million square feet (500,700 sq m) to be used in a wide variety of applications, including assembly, painting, bodywork, R & D center, training facility, a test track, and a supplier complex of 12 buildings. As a way to reduce reinforcement-related project time as well as offer economic advantages compared to conventional temperature-steel wire mesh or steel fibers, Engineer Bina specified several dosages of the FORTA-FERRO® in various slab areas, which varied in thickness from 6 to 10 in. (15 to 25 cm). Even at the relatively high fiber dosage, the FORTA-FERRO®  mixed and distributed evenly throughout the concrete, and provided the owner with a fiber-free surface finish. Overall, a total of 603,000 lbs. (274,300 kg.) of fiber have been used within the new Fiat complex, and was to have been officially completed in 2015.

Key Points:

  • Superior Finish
  • Extreme Durability
  • Superior Mixing & Distributing

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =