Farrington Highway Bus Pad – Waipahu, HI

Waipahu, HI - 2009

Project Description

Fibers were specified to reinforce the bus pad on Farrington Highway in front of Jack-In-The-Box in Waipahu, HI. FORTA-FERRO macro synthetic fibers were chosen to reinforce this slab-on-ground at a dosage of 7.5 lb/ cu yd. The county chose to use fibers to replace steel to help save taxpayers money while increasing the durability of the concrete. By replacing steel with fibers, the contractors were able to save time and complete the project faster.

Key Points

  • Increased Durability
  • Save Time
  • Save Money

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =