Family Resource Center – Franklin, PA

Franklin, PA - August 2018

Project Description

The Family Resource Center replaced its originally specified steel with macro synthetic FORTA-FERRO fibers in a new construction in Franklin, PA. The total project was 80 cu yd and required a
dosage of 3.0 lb/cu yd of macro synthetic FORTA-FERRO fibers. This was a typical slab-on-ground construction with a wood frame building on top, showing that macro fibers can be a useful tool for smaller concrete contractors as well. The fibers in this project allowed the contractor to save a full day of placing and tying steel, as well as making this project more profitable now and in the future.

Key Points:

  • Easy to Mix
  • Saved Time
  • Time Saving

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =