Evans General Contractors – Savannah, GA

Savannah, GA - 2019

Description

Evans General Contractors used FORTA-FERRO to replace the conventional steel reinforcement for the slab-on-deck (SOD) and slab-on-ground (SOG) applications in their new Savannah, GA office building. Contractors used a dosage of 3.0 lb/cu yd in the SOG and 4.0 lb/cu yd in the SOD of FORTA-FERRO macro synthetic fiber. Since wire mesh was replaced, workers had a safer work environment with no tripping hazards. No crane was needed to lift steel reinforcements to the second story SOD – reducing costs and decreasing construction time. Small office buildings can benefit greatly from making macro synthetic fibers the industry standard for concrete reinforcement.

Key Points

  • Safer Work Environment
  • Reduced Costs
  • Decreased Construction Time

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =