DZ Corporate Construction – Sumterville, FL

Sumterville, FL - 2021

Description

The wire mesh in the pavement on these newly constructed concrete ready mix, block, and precast yards was replaced with FORTA-FERRO macro synthetic fiber. FORTA engineers examined the multiple caseload conditions and recommended various thickness and fiber addition rates accordingly. 7.5 lbs./cu yd of FORTA Ferro was used in the precast storage and high traffic areas of the bulk material slab zones, while 5.0 Ibs./cu yd was used in the other areas. In all, over 160,000 lbs. of FORTA-FERRO were incorporated and provided full-depth reinforcement to this 1 million sq ft project.

Key Points

  • Enhanced Concrete Performance
  • Improved Safety 
  • Reduced Production Schedule

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =