Cumberland Valley High School

Mechanicsburg, PA - 2017

Project Description

The newly built Cumberland Valley High School required multiple slab-on-ground and slab-on-metal-deck applications for the building. FORTA-FERRO® was specified to reinforce the 6,500 pounds of concrete for these slab applications. The macro synthetic fiber was chosen over competing reinforcement methods and was specified to replace steel. The use of FORTA-FERRO® helped to reduce the project construction time because cumbersome steel reinforcement was replaced.

Key Points

  • Reduced Cracking
  • Mixed and Pumped Easily
  • Cost Effective
  • Speed of Construction

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =