Bridge Deck

Brooklyn Center, MN - 2017

Project Description

This high-performance bridge deck in Brooklyn Center, Minnesota, along highway 694 and 252 was placed in May of 2017. The Minnesota Department of Transportation (MnDOT) wanted to reduce cracking and prevent water intrusion through the concrete, which contributes to freeze-thaw deterioration. The entire bridge deck was pumped and placed in one day, saving the project time and money. FORTA-FERRO® mixed evenly and uniformly and showed no difficulty in the pumping, placing, or finishing of the concrete.

Key Points

  • Reduced Cracking
  • Excellent Mixing and Finishing
  • Easily Pumped and Place

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =