Project Description
Blominmäki, a large underground wastewater treatment plant, approximately 300 m x 400 m, used FORTA-FERRO macro synthetic fiber to reinforce multiple applications including driving paths and wastewater pools. This big project, in Espoo, Finland, replaced traditional wire mesh with a fiber dosage of 4.5 kg/m3. Using FORTA-FERRO will reduce cracking and increase the durability of the concrete in this underground facility. Speed of construction was increased using fiber and this led to cost savings as a result.
Key Points
- Increase Durability
- Speed of Construction
- Reduce Cracking
- Cost Savings