Blackstone River Road – Worcester, MA

Blackstone River Road LLC. - Summer 2016

Project Description

FORTA-FERRO® macro synthetic fiber was chosen by the contractor, Senate Construction Corporation, in order to replace traditional steel reinforcement (#3 steel at 18’ O.C) in both their concrete mezzanine and topping slab projects shown above. Due to the contractor’s previous experience with FORTA-FERRO®, it has become the obvious choice because of its superior quality and finish, ease of use, and adaptability for various applications ranging from the office space to heavy equipment areas.

  • Used in Variety of Applications
  • Ease of Use
  • Superior Finish

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =