Blackhawk County PCC Unbonded Overlay – Black Hawk County, IA

Black Hawk County, IA - 2022

Project Description

This overlay project was the largest FORTA-FERRO project for 2022, using over 200,000 lb. of FORTA’s most popular fiber reinforcement. This pavement was over 13 miles long and 32 ft. wide. The addition of the fiber promises to be a viable return on owner investment due to the extended life and durability.

Technical Specifications

  • Fiber Reinforcement: FORTA-FERRO® 2-¼”
  • Application: Overlay
  • Slab Thickness: 5″
  • Total Project Size: 40,000+ yds

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =