Allianz Field – St. Paul, MN

St. Paul, MN - 2017

Project Description

A brand new 20,000 seat soccer stadium for Minnesota United FC of Major League Soccer, required an alternative reinforcement method for several areas of construction. This $150 million project utilized FORTA-FERRO® for slab-on-ground applications and terraced seating areas. The use of fiber allowed for a safer work environment by preventing trips and falls that often come with the use of steel rebar. The concrete finishers noted that FORTAFERRO® was extremely easy to place, finish, and broom. Overall, the use of FORTA-FERRO® in Allianz Field helped to reinforce the positive reputation the fiber has with project owners and contractors.

“There is a lot of handwork on the project and our finishers found FORTA-FERRO® easy to finish and were satisfied with the product.” 

– Project Contractor

Technical Specifications

  • Fiber Reinforcement: FORTA-FERRO® 2-¼”
  • Replaced: Specified Steel
  • Total Project Size: 345,000 sq ft
  • Finishing Method: Broom Finish /Unfinished Risers

Download PDF

 

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =