Meadows VII Warehouse Facility – Forsyth County, GA

Forsyth County, GA - 2019

Project Description

Fibers were specified for an exterior paving application of the truck dock and ramp at a 60,000 – 92,000 sq ft warehouse facility in Forsyth County, GA. FORTA-FERRO macro synthetic fibers were used at a dosage of 3.0 lb/cu yd in this pavement application that totaled 22,758 sq ft. FORTA-FERRO macro fibers were used to add toughness and increase crack control. Since this large facility has high volume traffic consistently picking-up and dropping-off loads, FORTA-FERRO was chosen to increase the impact resistance and durability of the paving slab. A broom finish was applied resulting in a superior finish with minimal surface fibers. The contraction joints were very clean and do not show any raveling.

Key Points

  • Increased Durability
  • Reduced Cracking & Raveling
  • Superior Finish

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =